Dashboard
Week of 24 Mar 2026
Press Line 5
92%
F16 Dies · 8 jobs
Press Line 2
78%
F12 Dies · 5 jobs
Paint Line 1
No jobs loaded
89%
Avg Utilisation
47
Schedules Run
13
Jobs This Week
Overview
Analytics
Calibration
Scenarios
Recent Runs
Upcoming Schedule Forecast
How the System Improves Over Time
1. Schedule
Optimiser generates sequence
2. Execute
Planners run, override if needed
3. Capture
Actual times + override reasons
4. Learn
Calibrate matrix, encode patterns
5. Improve
Better predictions, fewer overrides
Override rate: 78% (Jan) → 62% (Mar)· Prediction error: ±0.8h (Jan) → ±0.3h (Mar)
Schedule History — Predicted vs Actual47 schedules
PeriodJobsFinal SequencePredictedActualDeltaEdits
Mar 24–278
Z63A67AR01ZR06Z00Z15A00bA00
8.0h8.7h+0.7h1
Mar 20–236
Z00A00Z63A67Z15AR01
6.2h6.0h-0.2h2
Mar 16–1910
A67Z63AR01ZR06Z15A00bZ00Z51A13A00
8.7h10.1h+1.4h3
Avg prediction error: +0.29h. 62% within ±0.3h.
3+ overrides average +1.1h above predicted.
62%override rate ↓ from 78%
Customer 38%
Shift 28%
Maint. 22%
Wire 12%
47 schedules · 29 overrides
Recent Overrides
DC
David C. · Mar 24–27
FG16A00 from pos 8 pos 1
Shift handover
Impact: +47m
MK
Mikko K. · Mar 20–23
FG16A00 pos 6 pos 1
Customer priority
Impact: +32m
JP
Jari P. · Mar 16–19
FG16A13 added pos 9, FB16A00 removed
Die in maintenance
Impact: +85m
Detected Patterns
Monday Position-1
FG16A00 moved to pos 1 in 4 of 5 Monday schedules.
Confidence: 80%
Wire Exhaustion
David C. exhausts HW498-18150 before switching. ~15 min saved.
Confidence: 92%
Night Shift Conservative
Night overrides 23% more conservative.
Confidence: 74%
Emerging: Front-loaded Runs
4 data points — needs 6 more.
Confidence: 45%
Comparing static matrix against actuals. 6 transitions show >15% divergence.
Significant Divergences
Transition
Distribution
Matrix / Actual / P80
FG16Z63 → FF16Z15
120m
143m
120 / 143 / 158m
23 pts · +19%
FA16Z00 → FG16A00
120m
145m
120 / 145 / 162m
19 pts · +21%
F16-AR01 → F16-ZR06
60m
78m
60 / 78 / 88m
28 pts · +30%
Model changes to your plant — machines, people, matrix, job allocation — and see the cascading impact on schedules, timing, and ROI.
Machines & Lines
People & Shifts
Matrix & Tooling
Job Allocation
Impact Analysis
CurrentModelledChange
Investment Required
£0
Capital expenditure
Payback Period
Weeks to recover investment
Schedule Impact Preview
8 jobs via SAP · 52.8h run · 66h capacity
94%
94% confidence this schedule fits within capacity. Based on 47 historical schedules.
High variance Z63→Z15
3 cross-cluster jumps
Changeover
8.0h
across 7 transitions
Run Time
52.8h
305K units
Total Load
60.8h
of 66h capacity
Utilisation
92%
5.2h headroom
Optimised Sequence
Drag to reorder ·
Pin to Position 1
Priority Job (schedule early)
Defer to Next Period
Capacity Waterfall
Changeover Matrix
Die Network
Nodes are dies in this job set. Edges show changeover cost — green = same cluster (15m), grey/dashed = cross-cluster (60–120m), red = penalty (180m).

Administration

Lines & Machines
Data Sources
Changeover Matrix
Job Configuration
Algorithm & Settings
Press Line 5
Active
Press Line 2
Configured
Paint Line 1
Demo
SAP Work Orders
Connected
Business Central
Connected
Throughput Database
Active
Internal database recording actual run times per die. 1,247 records across all lines. Last synced: 2 min ago. Auto-captures from floor sensors.
Maintenance SystemNot connected
Connect your maintenance system to automatically exclude unavailable dies from schedules.
Select Line
Last updated: 15 Jan 2026
Clusters detected: 3 (auto from matrix values)
Calibration data points: 1,247

Drop matrix file (CSV, Excel, JSON) or click to browse
Current Matrix — F16
Job Configuration — Press Line 5
Die IDWire/MaterialClusterBatchRun (hrs)PriorityDue DateStatus
Optimisation Settings
P50 uses median actual times where 20+ data points exist, falls back to matrix values.
Schedules below this confidence show a warning.
Notifications & Permissions
Email Notifications
User Roles
David C. — Planner
Mikko K. — Planner
Tero L. — View only
Schedule Assistant
Knows your lines, history & patterns
Proactive Suggestions
• Apr 1–4 is at 95% utilisation on Line 5. Consider deferring FB16A00 (smallest batch) or moving 2 jobs to Line 2 which has 22% headroom.
• Your FG16Z63 → FF16Z15 transition consistently takes 19% longer than the matrix predicts. I’d recommend updating the matrix value from 120m to 143m.
• David C. overrides position 1 on Mondays 80% of the time. Consider making FG16A00-first a Monday default rule.